Wednesday we got 20 tons of crush and run stone delivered from the local quarry to make a hard standing parking area from the road to just inside the gate, and a turning area through into the field. Huw used the digger to level off the ground and we spread out some terram and some plastic netting to stop the stone sinking into the mud too much. Then he spread the stone out and compacted it down. It looked alright, but we realized we had underestimated how far 20 tons would go. We rang them up and ordered another lorry load for the next morning before the 20 tons of scalpings we had ordered arrived.


While he did that I had a look at the mess at the front of the cottage. Several trees had been taken down here. They were too close to the cottage and growing from the top of a stone wall, which is why they were leaning so badly. They had to go or we would lose the wall and the cottage roof! But in getting the digger along there to prevent them falling on the cottage it had disturbed the stone edged flower border that had run along there. On the plus side it was a much bigger area than previously thought. I started digging around to retrieve the stones so that in time I can rebuild the border to the flower bed and reinstate it. At the far end the damage was worse - the tree roots had already pretty much demolished the wall and there had been a gap in the hedgerow created with a drop down onto the lane for some reason. We wondered if it was for unloading deliveries to the front of the cottage perhaps. I collected up the stones here too as we are going to fill that gap in and I’ll try and assemble some kind of stone wall along there to finish it off nicely.



Once Huw was done with the driveway he decided it was time for a little more demolition - he wanted to get rid of the concrete water tank at the back of the cottage. I watched him gently and carefully begin to dig away at the mound of fallen stone and earth from along the gable end of the cottage, ensuring he didn’t knock the delicate and crumbling cottage wall. Then around the tank too. The tank looked like it wasn’t connected to the house, but there was the concrete slab that had been used to render the cottage, and the weight of it was resting on the water tank. He began to try and pull the tank out and I was watching and waiting for the back wall of the cottage to collapse. The tank weighs a ton and it took a few attempts before it started to move. And then I was yelling to stop, stop!! A crack had appeared in the wall as the corner of the roof had lifted, pushed up by the tank lifting the concrete slab that was resting on it. We inspected the wall. Huw pushed the slab back in with the digger bucket and a few pieces of it cracked off and fell away. The stones beneath remained in tact. Phew. Huw got his sledgehammer and knocked the concrete slab a few times and it broke up and came away neatly. All the concrete will have to be removed eventually and replaced with lime render to allow the cottage to breathe properly anyway. But I don’t want to do too much before we are in a position to fix the mortar beneath. But now the water tank was free enough to be pulled away. Underneath it, stuck to the underside, a surprise - some old metal advertisements for Lyons tea and Royal Standard paraffin. I couldn’t get them off as they had been used as concrete forms and were well and truly stuck to the tank bottom. Another little piece of history to the cottage.



Huw continued digging around the cottage  but we soon realized we can’t dig down as far as we thought because the bottom of the walls is marked by a concrete sill running all the way round the cottage. And below that it is just shale and digging away any more would undermine the walls. So we stopped there to decide what’s next.


While I made tea in shed HQ I noticed one of our apples had a big hole in one side made by tiny teeth. We had had a furry friend visit for a snack.



 
 
 